BUILDINGS AND GROUNDS
District Wide Project List 2006-2007
1)
Flooring: ongoing replacement program
Asbestos
removal of seven rooms in upper wing – Complete – Installed new tile and base
board
2)
Exterior
Painting and Lead Encapsulation: In-house program
a.
b.
c.
(On Hold Until Spring)
3) Interior
Painting:
a.
b.
High School – Cafeteria Ceiling - Complete
4) Blinds:
d.
e.
5)
Paving:
a.
b.
Aquidneck School
– Front Entrance will be done in Spring
c.
High School –
Back walkway will be done in the Spring
(On Hold Until
Spring)
6)
Exterior Door
Accessibility:
a.
b.
7) Interior
Door hardware:
a.
8) Roof
Update:
9)
Fire Upgrade:
a.
10) Generators
a.
b.
c.
d.
11) Fields
– Slicing/Aerating/Seeding/Fertilizing/Lime
a.
b.
c.
Remove turf
blanket, start field maintenance program for spring sports
d.
High School –
Practice Areas – Complete
e.
f.
12)
French Drainage System
a.
b.
13.
Enclosing Dumpsters
a.
b.
c.
d.
Receiving quotes – work to start this month.
14. Gaudet
Library
a.
Remove wooden
wall – Complete
b.
Remove glazing
from windows – In Progress