DECEMBER REPORT SUBMITTED BY EDWARD COLLINS

 

 

BUILDINGS AND GROUNDS

 

 

DISTRICT WIDE PROJECT LIST

 

 

 

1)      FLOORING: ongoing replacement program

 

 

i)                    JFK- COMPLETE

ii)                  High School- gym foyer-COMPLETE

iii)                High School-asbestos removal top hallway-COMPLETE

 

 

 

2)      EXTERIOR PAINTING/LEAD ENCAPSULATION

 

               

i)                    High School- 80% done

ii)                  Gaudet- 80% done           

iii)                JFK- 25% done

    ON HOLD UNTILL SPRING

 

 

3)      INTERIOR PAINTING

 

 

i)                    Forest Ave- old wing ceilings-COMPLETE

                                 Rest of building-in progress

 

 

4)      BLINDS

 

i)                    JFK-COMPLETE

ii)                  Gaudet -COMPLETE

 

 

 

 

\

 

 

5)   PAVING

 

i)                      Gaudet- finish curbing and sidewalks

ii)                  Aquidneck- front entrance /spring

iii)                High School- back walk way/spring

               ON HOLD FOR SPRING

 

 

6)      EXTERIOR DOOR ACCESSIBILITY

 

i)                     JFK-ramp and railing-COMPLETE

ii)                   JFK-repair thresholds at all doors-COMPLETE

 

  

 

      7)   INTERIOR DOOR HARDWARE

               

 

                     i)      Gaudet-custodial and office doors-in progress

         

 

8)      ROOF

 

i)                     Aquidneck- in spring

ii)                  High School-section of roof over 248-COMPLETE

 

 

        9)    FIRE UPGRADE

 

 

i)                    High School- addition of pull station/heat-smoke and strobes 95%  

 

 

10)   GENERATORS

iii)                High School- in progress

iv)                Gaudet-in progress

v)                  Oliphant- in progress

      

 

11)     FIELDS- slicing/aerating/seeding/fertilize/lime

                      

i)        High School- front practice area-COMPOLETE

ii)      Gaudet-baseball/football/practice area-COMPLETE

                                       Placed turf blanket on football field

 

 

12)   FIELDS- re-crowning

           

iii)    High School- practice area’s -COMPLETE

iv)    Gaudet- practice area’s-COMPLETE

v)      Gaudet- Football field/ Waverly landscaping-COMPLETE

       

 

13)   FRENCH DRAINAGE SYSTEM

 

vi)    Gaudet- easement on side of cafeteria-COMPLETE

vii)  Aquidneck- bottom area along addition-COMPLETE