JANUARY REPORT SUBMITTED
EDWARD COLLINS
BUILDINGS AND GROUNDS
District Wide Project List
2005-2006
1)
Flooring: On-going replacement
program
i)
Gaudet-lower
one half of lower level – Complete. The rest is scheduled for February
vacation/CIP money
ii)
2)
Whiteboards: On-going in-house chalkboard replacement
i) MHS - 100% done
ii) Gaudet - 100% done
iii) Elementary 70% done
3)
Bulletin Boards: On-going in-house replacement program
i)
MHS
- 80% done
ii) Gaudet - 80% done
iii) Elementary - 90% done
4)
Exterior Painting and Lead encapsulation: In-house program
i)
MHS
- 75% done
ii) Gaudet - 50% done
iii) All rest on hold until
spring
5) Interior Painting: On-going
in-house program
i)
MHS
– Painting of gym entrance - Complete
ii)
Gaudet
- done
iii)
JFK
- All but four rooms – Complete
iv)
Aquidneck
- Scheduled to begin middle of this month
6)
Bookcases: On-going in-house program
i)
MHS
- 95% done
ii)
Gaudet
- 95% done
iii)
JFK
- 75% done
iv)
Aquidneck/Forrest
- On hold/need funding
7) Paving, safety and drainage
program :
10-year management plan written by Louis Berger Group.
i) Gaudet-
entrance and front parking lot scheduled for spring/ CIP money
ii) Forest
Ave- front parking and drive scheduled for spring/CIP money
8)
Interior
i) High School - Complete
ii) Rest of District – On-going/ 20% done
9) Interior Door hardware : ongoing
program to make all door hardware
i) High
School - Complete
10) Acoustics: The following areas have
been designated for some type of acoustical treatment
i)
Forrest
gym - No action
ii) JFK cafeteria - No action
iii) Gaudet cafeteria - No
action
11) Roof
Update: Bond/insurance
i)
Gaudet
- Add four roof drains - Complete
ii) Aquidneck – Repaired leak
in Annex - Complete
iii)
High
School - Section of foyer roof entering gym was damaged in storm. In process of being repaired. Insurance covering cost
12)
Rest rooms: District-wide
i) Replace
Bradley sinks
a) Gaudet – Complete
b) High School – Complete
ii) Replace
gravity feed urinals - Complete
iii) Increase size of stalls to comply with ADA-in
progress
a) MHS - Complete
b) Gaudet - Complete
iv) Lower
mirrors - In progress
a) MHS - Complete/will
add regular mirrors
b) Gaudet - Complete
13) Add grab bars-in progress
i)
MHS
Complete
ii) Gaudet Complete
14) Other
i) Forest Avenue - Remove large box covering old
toilet area and repair floor - no action
ii)
15) Other
plumbing improvements:
i) Add two
sinks in annex at JFK - Complete
16) Handrails:
- District-wide - No action
17) Exterior
door accessibility:
i)
JFK
replace ramp- no action
ii) Aquidneck: 5 x 5 landing at
east entrance -no action
18) High
School Greenhouse
i)
The
Greenhouse is complete and has been inspected by building official and fire
department. Final cost was approximately
$15,000.00.
ii)
All
structures except for the greenhouse have been taken down, we will pick back up
on this in spring
19)
Security
i)
20) Fire Upgrade
i)
Oliphant-
new fire panel - Complete
ii) High School -new fire panel
- Complete
iii) Gaudet- new fire panel to