JANUARY REPORT SUBMITTED EDWARD COLLINS

 

BUILDINGS AND GROUNDS

 

District Wide Project List 2005-2006

 

1)      Flooring:  On-going replacement program

 

i)        Gaudet-lower one half of lower level – Complete.  The rest is scheduled for February vacation/CIP money

                        ii)   Forest:  Special Education Room (102) – Complete

 

2)      Whiteboards: On-going in-house chalkboard replacement

 

i)     MHS - 100% done

ii)    Gaudet - 100% done

iii)    Elementary 70% done

 

3)      Bulletin Boards: On-going in-house replacement program

 

i)        MHS - 80% done

ii)      Gaudet - 80% done

iii)    Elementary - 90% done

 

4)      Exterior Painting and Lead encapsulation:  In-house program

 

i)        MHS - 75% done

ii)      Gaudet - 50% done

iii)    All rest on hold until spring

 

5)   Interior Painting:  On-going in-house program

 

i)        MHS – Painting of gym entrance - Complete

ii)      Gaudet - done

iii)    JFK - All but four rooms – Complete

iv)    Aquidneck - Scheduled to begin middle of this month

 

6)         Bookcases:  On-going in-house program

 

i)        MHS - 95% done

ii)      Gaudet - 95% done

iii)    JFK - 75% done

iv)    Aquidneck/Forrest - On hold/need funding

 

7)      Paving, safety and drainage program : 10-year management plan written by Louis Berger Group.

 

i)   Gaudet- entrance and front parking lot scheduled for spring/ CIP money

ii)  Forest Ave- front parking and drive scheduled for spring/CIP money

 

8)      Interior ADA signage plan: part of 5-year ADA improvement program

 

 i)  High School - Complete

 ii)  Rest of District – On-going/ 20% done

 

9)   Interior Door hardware : ongoing program to make all door hardware ADA compliant

 

i)   High School - Complete

 

10)  Acoustics: The following areas have been designated for some type of acoustical treatment

 

i)        Forrest gym - No action

ii)      JFK cafeteria - No action

iii)    Gaudet cafeteria - No action

 

11)  Roof Update:  Bond/insurance

 

i)        Gaudet - Add four roof drains - Complete

ii)      Aquidneck – Repaired leak in Annex - Complete

iii)    High School - Section of foyer roof entering gym was damaged in storm.  In process of being repaired.  Insurance covering cost

 

12)   Rest rooms:  District-wide ADA upgrades based on 5-year plan

 

i)  Replace Bradley sinks

  a)  Gaudet – Complete

  b)  High School – Complete

 

ii)  Replace gravity feed urinals - Complete

iii) Increase size of stalls to comply with ADA-in progress

   a)  MHS - Complete

   b)  Gaudet - Complete

 

iv)  Lower mirrors - In progress

 

    a)  MHS - Complete/will add regular mirrors

    b)  Gaudet - Complete

 

13)    Add grab bars-in progress

 

i)        MHS Complete

ii)      Gaudet Complete

 

14)   Other ADA

 

i)  Forest Avenue - Remove large box covering old toilet  area and repair floor -   no action

ii) High School- remodel nurses room - Complete

 

15)  Other plumbing improvements:

 

i)  Add two sinks in annex at JFK - Complete

 

16)   Handrails: - District-wide - No action

 

17)  Exterior door accessibility:

 

i)        JFK replace ramp- no action

ii)      Aquidneck: 5 x 5 landing at east entrance -no action

 

18)  High School Greenhouse

 

i)        The Greenhouse is complete and has been inspected by building official and fire department.   Final cost was approximately $15,000.00.

ii)      All structures except for the greenhouse have been taken down, we will pick back up on this in spring

 

19)  Security

 

i)        High School- card system is up and running

 

20)   Fire Upgrade

 

i)        Oliphant- new fire panel - Complete

ii)      High School -new fire panel - Complete

iii)    Gaudet- new fire panel to be complete by end of month